Print Page
Image is for illustrative purposes only. Please refer to product description.

ManufacturerBANNER ENGINEERING
Manufacturer Part NoMMD-TA-11BCopy
Manufacturer Standard Lead Time4 weeks
Newark Part No.51M5613
Your Part Number
Available to Order
Manufacturer Standard Lead Time: 4 week(s)
| Quantity | Price |
|---|---|
| 1+ | $986.110 |
Price for:Each
Minimum: 1
Multiple: 1
$986.11
Line Note
Added to your Order Confirmation, Invoice, and Dispatch note for this order only.
Product Information
ManufacturerBANNER ENGINEERING
Manufacturer Part NoMMD-TA-11BCopy
Manufacturer Standard Lead Time4 weeks
Newark Part No.51M5613
Technical Datasheet
Coil Voltage24VAC/VDC
Contact ConfigurationDPST-NO, SPST-NC
Product Range-
Relay MountingDIN Rail
Contact Current-
Relay Terminals-
Contact Voltage AC Nom-
Contact Voltage DC Nom24V
Contact Material-
IP RatingIP20
Approvals & StandardsCSA, UL
SVHCNo SVHC (15-Jan-2018)
Technical Specifications
Coil Voltage
24VAC/VDC
Product Range
-
Contact Current
-
Contact Voltage AC Nom
-
Contact Material
-
Approvals & Standards
CSA, UL
Contact Configuration
DPST-NO, SPST-NC
Relay Mounting
DIN Rail
Relay Terminals
-
Contact Voltage DC Nom
24V
IP Rating
IP20
SVHC
No SVHC (15-Jan-2018)
Technical Docs (2)
Legislation and Environmental
US ECCN:EAR99
EU ECCN:Unknown
RoHS Compliant:Yes
RoHS
RoHS Phthalates Compliant:Yes
RoHS
SVHC:No SVHC (15-Jan-2018)
Download Product Compliance Certificate
Product Compliance Certificate
