Print Page
Available to Order
Manufacturer Standard Lead Time: 20 week(s)
| Quantity | Price |
|---|---|
| 500+ | $35.860 |
Price for:Each
Minimum: 500
Multiple: 500
$17,930.00
Line Note
Added to your Order Confirmation, Invoice, and Dispatch note for this order only.
Product Information
| Manufacturer | LEDEX |
|---|---|
| Manufacturer Part No | C5-272-B-1Copy |
| Manufacturer Standard Lead Time | 20 weeks |
| Newark Part No. | 20M1033 |
| Product Range | C5 Series |
| Technical Datasheet | |
| Frame Type | C Type |
| Solenoid Duty Cycle | Continuous |
| Holding Force | 14ozf |
| Coil Voltage | 6VDC |
| Solenoid Operation | Pull |
| Coil Resistance | 11.52ohm |
| Coil Power Continuous | 3W |
| Product Range | C5 Series |
| SVHC | No SVHC (15-Jan-2019) |
Technical Specifications
| Frame Type | C Type |
|---|---|
| Holding Force | 14ozf |
| Solenoid Operation | Pull |
| Coil Power Continuous | 3W |
| SVHC | No SVHC (15-Jan-2019) |
| Solenoid Duty Cycle | Continuous |
|---|---|
| Coil Voltage | 6VDC |
| Coil Resistance | 11.52ohm |
| Product Range | C5 Series |
Technical Docs (2)
Legislation and Environmental
| US ECCN: | EAR99 |
|---|---|
| EU ECCN: | Unknown |
| RoHS Compliant: | Yes RoHS |
| RoHS Phthalates Compliant: | To be advised |
| SVHC: | No SVHC (15-Jan-2019) |
| Download Product Compliance Certificate | Product Compliance Certificate |

